Using a colour corrector bottle

In the case of small scratches, use a needle, break the stopper and, after gently applying it to the damaged area, press the lower part of the bottle until the paint appears, cover the damaged area.
DO NOT press (press hard) the needle on the affected area, just add it gently!!!

To use the brush, you need to unscrew the gray part of the bottle. The brush is used to mask larger areas.

Dazu korektoriaus buteliuko naudojimas

Paint

Shake the bottle well before use. Before painting, the surface must be free of grease, dry and clean.
The paint used corresponds to the colours of car manufacturers and is made in Germany. Paint is applied in layers. The next layer is applied after the first layer has dried. The number of layers depends on the coverage of the paint. We recommend varnishing the painted surface. An unvarnished painted surface will be less resistant to environmental factors and less glossy.

The drying time of one paint layer at a temperature of +20 degrees Celsius is 15 minutes.
Cooler temperatures will increase the drying time.

03 scaled

Varnish

Do not shake before use, as air bubbles will form and the varnish will not be distributed evenly on the damaged surface. Varnish is applied as a final layer after paint. Varnish is also applied in layers. The varnish will provide resistance to environmental factors and provide shine. The drying time depends on the air temperature.

The drying time of one varnish layer at a temperature of +20 degrees Celsius is 45 minutes. Full drying time – 10h.
Cooler temperatures will increase the drying time.

02 scaled

Primer

Shake the bottle well before use. Before painting, the surface must be clean, free of grease and rust.
Use only if the primer layer is damaged and metal is visible or the damaged area has started to rust.
The primer is water-based, so you can wipe off the excess with water (before it dries). The dried can be removed using acetone, alcohol or nitro thinner.

Primer drying time at a temperature of +20 degrees Celsius – 2h45min.
Cooler temperatures will increase the drying time.

01 scaled